rojo/rojo-test/serve-test-snapshots
Joe f28ee8435a Update audit plans and documentation for Rojo_Ref_* attributes
- Revised the audit documentation to standardize the naming convention for `Rojo_Ref_*` attributes, ensuring consistency across all references.
- Enhanced the design section to clarify the handling of attribute updates during instance renames, emphasizing the need for accurate path updates.
- Adjusted the processing order in `compute_ref_properties` to prioritize `Rojo_Target_*` attributes, preventing unintended overwrites of `Rojo_Ref_*` attributes.
- Added new tests to verify the correct behavior of reference path changes and ensure robustness against edge cases.

These changes improve the clarity and reliability of the synchronization system's handling of reference attributes.
2026-02-14 17:00:10 -06:00
..
end_to_end__tests__connected_mode__connected_add_seq_1.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_add_seq_2.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_add_seq_3.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_api_then_fs_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_clean_slug_clean_step1.snap Update snapshot files and enhance VFS event handling 2026-02-12 02:13:58 -06:00
end_to_end__tests__connected_mode__connected_clean_slug_clean_step2.snap Update snapshot files and enhance VFS event handling 2026-02-12 02:13:58 -06:00
end_to_end__tests__connected_mode__connected_clean_slug_clean_step3.snap Update snapshot files and enhance VFS event handling 2026-02-12 02:13:58 -06:00
end_to_end__tests__connected_mode__connected_collision_evo_step1.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_collision_evo_step2.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_collision_evo_step3.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_cursor_final_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_dedup_add_third_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_dedup_edit_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_dedup_no_meta_stem_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_dedup_remove_one_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_delete_init_from_dir_final.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_delete_init_from_dir_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_edit_init_then_child_child.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_edit_init_then_child_init.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_create_in_folder_final.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_create_in_folder_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_cycle_patch1.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_cycle_patch2.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_cycle_patch3.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_delete_survive_final.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_delete_survive_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_meta_creation_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_type_module_to_server_final.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_type_module_to_server_initial.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_type_module_to_server_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_type_server_to_local_final.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_type_server_to_local_initial.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_init_type_server_to_local_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_meta_add_name_to_clean_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_meta_update_name_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_model_create_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_model_delete_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_model_edit_props_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_model_name_edit_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_model_remove_name_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_multi_edit_local.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_multi_edit_server.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_multi_edit_standalone.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_reconnect_cursor0_catchup.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_remove_seq_1.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_remove_seq_2.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_remove_seq_3.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_replace_init_type_final.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_replace_init_type_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_sequence_create.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_sequence_delete.snap Update snapshot files and enhance VFS event handling 2026-02-12 02:13:58 -06:00
end_to_end__tests__connected_mode__connected_sequence_edit.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_sequence_rename.snap Update snapshot files and enhance VFS event handling 2026-02-12 02:13:58 -06:00
end_to_end__tests__connected_mode__connected_slug_chain_step1.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slug_chain_step2.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slug_chain_step3.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slug_chain_step4.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slug_create_new_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slug_delete_meta_revert_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slug_delete_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slug_edit_meta_name_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slug_edit_server_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slug_edit_source_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slugdir_add_child_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slugdir_edit_init_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__connected_mode__connected_slugdir_init_type_change_patch.snap Enhance connected mode test suite and introduce VFS staleness fixtures 2026-02-11 17:56:37 -06:00
end_to_end__tests__serve__add_folder_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__add_folder_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__add_folder_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__add_folder_subscribe.snap Use WebSocket instead of Long Polling (#1142) 2025-11-26 19:57:01 -08:00
end_to_end__tests__serve__add_optional_folder.snap Use WebSocket instead of Long Polling (#1142) 2025-11-26 19:57:01 -08:00
end_to_end__tests__serve__add_optional_folder_all-2.snap Add support for optional paths (#472) 2022-04-19 18:43:47 -04:00
end_to_end__tests__serve__add_optional_folder_all.snap Add support for optional paths (#472) 2022-04-19 18:43:47 -04:00
end_to_end__tests__serve__add_optional_folder_subscribe.snap Add support for optional paths (#472) 2022-04-19 18:43:47 -04:00
end_to_end__tests__serve__edit_init_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__edit_init_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__edit_init_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__edit_init_subscribe.snap Upgrade dependencies and refactor serialization in build.rs 2026-02-06 18:57:29 -06:00
end_to_end__tests__serve__empty_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__empty_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__empty_json_model_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__empty_json_model_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__empty_json_model_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__empty_json_model_subscribe.snap Upgrade dependencies and refactor serialization in build.rs 2026-02-06 18:57:29 -06:00
end_to_end__tests__serve__forced_parent_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__forced_parent_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__forced_parent_serialize_model.snap Use SerializationService as a fallback for when patch application fails (#1030) 2025-09-21 15:09:20 -07:00
end_to_end__tests__serve__meshpart_with_id_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__meshpart_with_id_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__meshpart_with_id_serialize_model.snap Update snapshot files to remove unnecessary attributes and improve consistency in property handling 2026-01-20 23:12:43 -06:00
end_to_end__tests__serve__model_pivot_migration_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__model_pivot_migration_all.snap Upgrade dependencies and refactor serialization in build.rs 2026-02-06 18:57:29 -06:00
end_to_end__tests__serve__move_folder_of_stuff_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__move_folder_of_stuff_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__move_folder_of_stuff_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__move_folder_of_stuff_subscribe.snap Upgrade dependencies and refactor serialization in build.rs 2026-02-06 18:57:29 -06:00
end_to_end__tests__serve__no_name_default_project_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__no_name_default_project_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__no_name_project_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__no_name_project_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__no_name_top_level_project_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__no_name_top_level_project_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__no_name_top_level_project_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__pivot_migration_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__pivot_migration_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__ref_path_change_target_patch.snap Update audit plans and documentation for Rojo_Ref_* attributes 2026-02-14 17:00:10 -06:00
end_to_end__tests__serve__ref_path_multiple_attrs_patch.snap Update audit plans and documentation for Rojo_Ref_* attributes 2026-02-14 17:00:10 -06:00
end_to_end__tests__serve__ref_path_new_file_patch.snap Update audit plans and documentation for Rojo_Ref_* attributes 2026-02-14 17:00:10 -06:00
end_to_end__tests__serve__ref_path_nonexistent_patch.snap Update audit plans and documentation for Rojo_Ref_* attributes 2026-02-14 17:00:10 -06:00
end_to_end__tests__serve__ref_path_remove_attr_patch.snap Update audit plans and documentation for Rojo_Ref_* attributes 2026-02-14 17:00:10 -06:00
end_to_end__tests__serve__ref_properties_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__ref_properties_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__ref_properties_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__ref_properties_patch_update_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__ref_properties_patch_update_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__ref_properties_patch_update_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__ref_properties_patch_update_subscribe.snap Upgrade dependencies and refactor serialization in build.rs 2026-02-06 18:57:29 -06:00
end_to_end__tests__serve__ref_properties_remove_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__ref_properties_remove_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__ref_properties_remove_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__ref_properties_remove_subscribe.snap Use WebSocket instead of Long Polling (#1142) 2025-11-26 19:57:01 -08:00
end_to_end__tests__serve__ref_properties_subscribe.snap Enhance redaction handling and update snapshot references 2026-02-06 19:20:16 -06:00
end_to_end__tests__serve__remove_file_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__remove_file_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__remove_file_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__remove_file_subscribe.snap Use WebSocket instead of Long Polling (#1142) 2025-11-26 19:57:01 -08:00
end_to_end__tests__serve__scripts_all-2.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__scripts_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__scripts_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__scripts_subscribe.snap Upgrade dependencies and refactor serialization in build.rs 2026-02-06 18:57:29 -06:00
end_to_end__tests__serve__sync_rule_alone_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__sync_rule_alone_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__sync_rule_complex_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__sync_rule_complex_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__sync_rule_no_extension_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__sync_rule_no_extension_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00
end_to_end__tests__serve__sync_rule_no_name_project_all.snap Update snapshot files to standardize messageCursor redaction 2026-02-08 12:07:20 -06:00
end_to_end__tests__serve__sync_rule_no_name_project_info.snap Refactor and rebrand Rojo to Atlas 2026-02-07 13:21:52 -06:00